California ICC UST Service Technician Practice Exam

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the California ICC UST Service Technician Exam with our interactive quiz. Featuring flashcards and multiple-choice questions, each with hints and explanations. Ace your exam with confidence!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


Cathodic protection systems must be inspected by a certified tester within how many months of installation?

  1. 3 months

  2. 6 months

  3. 12 months

  4. 24 months

The correct answer is: 6 months

Cathodic protection systems are critical for preventing corrosion in underground storage tanks and other metal structures. According to industry standards and regulations, these systems must be inspected by a certified tester within six months of installation to ensure they are functioning correctly and effectively. This requirement allows for any adjustments or repairs to be made promptly, enhancing the longevity and safety of the system. The six-month timeframe is designed to provide a balance between thoroughness and efficiency, ensuring that the cathodic protection is performing as intended soon after installation.