California ICC UST Service Technician Practice Exam

Disable ads (and more) with a membership for a one time $4.99 payment

Prepare for the California ICC UST Service Technician Exam with our interactive quiz. Featuring flashcards and multiple-choice questions, each with hints and explanations. Ace your exam with confidence!

Practice this question and more.


According to EO VR 201-A, what must be done with breakaway reconnections?

  1. Discarded immediately

  2. Logged in GDF log

  3. Presented to inspectors

  4. Stored for future reference

The correct answer is: Logged in GDF log

The correct answer is that breakaway reconnections must be logged in the GDF (General Data File) log. This procedure is essential for maintaining accurate records and ensuring compliance with regulatory requirements. Logging these reconnections provides a documentation trail that is important for both operational integrity and safety. In the context of UST (Underground Storage Tank) operations, this logging process helps track the performance of the breakaway connections over time, which can be critical for identifying trends or potential issues that may need addressing. It also serves as evidence during inspections, demonstrating that the operation adheres to established guidelines and regulatory standards. Maintaining such logs is a fundamental aspect of operational best practices in UST management, as it contributes to accountability and facilitates easier reporting during audits or inspections. This systematic approach to documentation helps ensure that all safety requirements are met, and any reconnections can be addressed in a timely manner if issues arise.